How does Inspectional Services know if the structure was placed in the location proposed?
For all new houses and for additions and in ground swimming pool, which have required setbacks a certified “as-built” plot, plan must be submitted to Inspectional Services after completion of the foundation or pool installation. Framing or final inspection for pools cannot proceed until the plot plan has been submitted.

Show All Answers

1. Is a plot plan required?
2. I have a mortgage plan that was given to me by the bank when I purchased my home. Can this be used?
3. Can I prepare my own plot plan, if I am certain where my property line is?
4. If I don't have a plot plan, where can I get one?
5. How does Inspectional Services know if the structure was placed in the location proposed?